Your English writing platform
Discover LudwigSuggestions(5)
Exact(7)
Actual performance of a technician in maintenance in section i belonging to worker category j required for maintenance activity k at period t.
We discuss the human structure maintenance in Section III and the panorama creation method in Section IV. Figure 2 The flowchart of proposed approach.
Actual quality of work done by a technician in maintenance in section i belonging to worker category j required for maintenance activity k at period t (kg).
Planned performance of a technician in maintenance in section i belonging to worker category j required for maintenance activity k at period t.
Planned quality of work done by a technician in maintenance in section i belonging to worker category j required for maintenance activity k at period t (kg).
Actual number of days a technician in maintenance in section i belonging to worker category j required for maintenance activity k at period t is available in a maintenance system (days).
Similar(53)
Upper value of fatigue experienced by a maintenance worker in section i belonging to maintenance worker category j that is required during overtime activity.
Minimum amounts of rework workloads for maintenance workers in section i. Maximum amounts of rework workloads for maintenance workers in section i. Lower value of improvement in service time of a worker in section i belonging to worker category j that is required during rework maintenance activity.
Open image in new window Fig. 14 All terrain, universal PC track beam erecting machine Open image in new window Fig. 15 Beam transport vehicle and erecting machine Open image in new window Fig. 16 Maintenance channel in section.
Upper value of improvement in service time of a worker in maintenance section i belonging to worker category j that is required during overtime maintenance activity.
Minimum amounts of overtime workloads for workers in maintenance section i. Maximum amounts of overtime workloads for workers in maintenance section i. Lower value of improvement in service time of a worker in maintenance section i belonging to worker category j that is required during overtime maintenance activity.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com