Your English writing platform
Discover LudwigExact(4)
Our goal is to maximize the continuous period of time (starting from time zero) when both machines are busy, which is equivalent to maximizing the minimum machine completion time if idle time is not introduced before all the jobs are completed.
The objective is to minimize the weighted sum of stage-two machine completion times.
There are k machines with speed s and hierarchy 1 which can process all the jobs, while the remaining m−k machines with speed 1 and hierarchy 2 can only process jobs with hierarchy 2. For the model with the objective to maximize the minimum machine completion time, we show that no online algorithm can achieve bounded competitive ratio, i.e., there exists no competitive algorithm.
Cheng et al., [11] studied two-stage differentiation flowshop consisting of a common critical machine in stage one and two independent dedicated machines in stage two by minimizing the weighted sum of machine completion times.
Similar(56)
Participants in the circuit training and resistance training groups will complete 1 repetition maximum testing on Cybex machines after completion of the treadmill exercise test to determine appropriate external loads for exercise training.
This combination minimizes machine workloads and completion time.
In this iteration, data is collected after machine preventive maintenanceschedule completion and replacement of grinding shoes of the machine as wellas rest pads of the fixture.
Their 1m-processor machine is due for completion in 2014.
We investigated whether functional network connectivity (FNC) measures were predictive of substance abuse treatment completion using machine learning pattern classification of functional magnetic resonance imaging data.
It is for the most part seen that when the rate of machining is moderate, i.e. it requires longer investment to machine then the surface completion is superior to that acquired while machining at a quicker rate.
Yevgeny Sergeyev, general director of the Izhorskiye machine works said the completion date for the first reactor unit at Bushehr had been set for 2002, but has now slipped to early 2004.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com