Your English writing platform
Discover LudwigSuggestions(1)
Exact(9)
Figure 6 Power line corridor between Ain Beni Mathar and Paris.
The last transit country is Switzerland, before the power line corridor reaches Greater Paris.
The exact course of the power line corridor is not yet lined out.
This study provides evidence of how local residents respond to the announcement of transmission line corridor route alternatives (TLCRAs).
To date, however, there is little knowledge about how to identify the ideal course of the power line corridor.
The starting point of the power line corridor is represented by the hybrid power plant in the Moroccan Ain Beni Mathar.
Similar(51)
Ed Dumas, a LIPA spokesman, said the authority was open to discussing hiking and biking trails along other portions of its more than 100 miles of transmission line corridors.
The two last categories (5 and 6), for example, are classified as suitable for the construction of power line corridors.
The presented GIS analysis might hence be a tool for the identification of suitable starting points of power line corridors.
It is then necessary to assess the protection areas for the suitability of the construction of power line corridors.
With respect to national specificities, natural and regional parks often emerge as protected areas suitable for power line corridors.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com