Used and loved by millions

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

late requirements

Grammar usage guide and real-world examples

USAGE SUMMARY

The phrase "late requirements" is correct and usable in written English.
It can be used to refer to requirements that are provided or identified after a project has already begun or is nearing completion. Example: "The team faced challenges due to the late requirements that were introduced during the final stages of development."

✓ Grammatically correct

Information Systems

Science

TechCrunch

The Guardian

The New York Times - Travel

BBC

IFAC Proceedings Volumes

Expert Systems with Applications

Journal of Big Data

Transportation Research Part D: Transport and Environment

Huffington Post

WikiHow

The Economist

Developmental Cell

Development (Cambridge)

eLife

Industrial Marketing Management

BMC Pediatrics

Simulation Modelling Practice and Theory

The Journal of Mathematical Neuroscience

Amino Acids

Genome Biology and Evolution

Bioinformatics and Biology Insights

The New York Times

EURASIP Journal on Wireless Communications and Networking

Science Magazine

Plosone

BMC Infectious Diseases

FEBS Letters

Applied Microbiology and Biotechnology

Physical Medicine and Rehabilitation Clinics of North America

Computer Standards & Interfaces

Emerging Health Threats Journal

CIRP Journal of Manufacturing Science and Technology

Nuclear Engineering and Design

Human-verified examples from authoritative sources

Exact Expressions

1 human-written examples

Our proposal adopts the i∗ organizational modeling framework, which offers the notions of actor, goal and (actor) dependency, and uses these as a foundation to model early and late requirements, architectural and detailed design.

Human-verified similar examples from authoritative sources

Similar Expressions

58 human-written examples

In agreement with this late requirement, a complete rescue of Pdx1 expression and endocrine pancreas differentiation in Raldh2−/− mice required RA treatment until E 9.5 [21], [21].

Science

Plosone

Overall, our data demonstrate a late requirement for bmp2b in the development of semicircular canals in the zebrafish that becomes manifest after 7 dpf.

Science

Plosone

As we show here, rescued homozygous swr/bmp2b−/− adults have severe structural abnormalities of the inner ear and concomitant balance defects, revealing a critical late requirement for bmp2b during semicircular canal morphogenesis in the zebrafish.

Science

Plosone

Mechanistically, in our experiments the results might reflect induction of nodal and its co receptor cripto (data not shown), by Wnt3a and Activin A. This synergy is also consistent with results reported by Hansson and colleagues who noted the late requirement for Wnt signalling in Activin A induction of Sox17+ definitive endoderm [20].

Science

Plosone

Previous studies suggest a late requirement for lin-12 activity to allow proper egg-laying behavior (Sundaram and Greenwald, 1993).

Science

eLife

A late requirement for Wnt and FGF signaling during activin-induced formation of foregut endoderm from mouse embryonic stem cells.

Science

eLife

It is only at later times, beginning at E16.5, that Runx1 expression becomes affected, suggesting a late requirement of NGF for maintenance of Runx1 expression.

Science

eLife

(M ) Real-time PCR analysis of Runx1 expression in control and Ngf -/-Bax -/- DRGs at E14.5 and P0 reveals a late requirement of NGF for Runx1 expression.

Science

eLife

The late requirement for PAR-2 probably reflects the role of PAR-2 in the maintenance, but not the establishment, of PAR-3 asymmetry (Cuenca et al., 2003).

Rather, the NH defects seen in later-stage fgf3 mutants might be secondary consequences of a late requirement for FGF signalling in NH maintenance (Pearson et al., 2011) and/or a consequence of the failed innervation and/or neurohormone release, consistent with data reporting effects of Vp release on pituicyte morphology (George et al., 1987; Rosso et al., 2004).

Show more...

Expert writing Tips

Best practice

To mitigate issues caused by "late requirements", implement flexible project management practices, such as Agile methodologies, which allow for adaptation to changing needs.

Common error

Failing to properly assess the impact of "late requirements" on project timelines and resources can lead to cost overruns and project delays. Always evaluate the scope and implications before integrating them.

Antonio Rotolo, PhD - Digital Humanist | Computational Linguist | CEO @Ludwig.guru

Antonio Rotolo, PhD

Digital Humanist | Computational Linguist | CEO @Ludwig.guru

Source & Trust

80%

Authority and reliability

4.1/5

Expert rating

Real-world application tested

Linguistic Context

The phrase "late requirements" functions as a noun phrase where 'late' modifies 'requirements'. It describes requirements that are identified or introduced after the initial planning phase, as confirmed by Ludwig.

Expression frequency: Rare

Frequent in

Science

50%

News & Media

25%

Formal & Business

25%

Less common in

Wiki

0%

Encyclopedias

0%

Social Media

0%

Ludwig's WRAP-UP

The phrase "late requirements" is used to describe requirements identified or introduced later in a project or process. Ludwig AI confirms its grammatical correctness and usability. While the phrase appears across different contexts, it is more frequent in scientific and technical domains. Effective management and clear communication about the impact of these "late requirements" are crucial for project success. If you're looking for alternatives, consider "delayed requirements" or "emergent requirements".

FAQs

How do you address "late requirements" in a project?

To address "late requirements", start by clearly communicating their impact to all stakeholders. Then, assess the resources and timeline adjustments needed, and prioritize based on project goals. Finally, integrate the changes using flexible project management methodologies.

What are some alternatives to saying "late requirements"?

You can use alternatives like "delayed requirements", "emergent requirements", or "newly introduced requirements" depending on the specific context.

Why is it important to manage "late requirements" effectively?

Managing "late requirements" effectively is crucial because poorly managed changes can lead to project delays, increased costs, and decreased quality. Clear communication and careful assessment are essential to mitigate these risks.

What is the difference between "late requirements" and "scope creep"?

"Late requirements" are specific, necessary changes introduced during a project, while "scope creep" refers to uncontrolled and often unnecessary additions to a project's scope. Effective management involves distinguishing between essential "late requirements" and potential scope creep.

ChatGPT power + Grammarly precisionChatGPT power + Grammarly precision
ChatGPT + Grammarly

Editing plus AI, all in one place.

Stop switching between tools. Your AI writing partner for everything—polishing proposals, crafting emails, finding the right tone.

Source & Trust

80%

Authority and reliability

4.1/5

Expert rating

Real-world application tested

Most frequent sentences: