Your English writing platform
Discover LudwigExact(2)
Over 230 direct jobs and an estimated 1,000 indirect ones could be hit by the decision from Spanish-owned utility, Scottish Power, to switch off the last generator at the 2,400 mega watt capacity plant.
"I was stood yesterday morning when they turned the last generator off where we were previously living and there was an eerie silence, which was a pretty strange feeling.
Similar(58)
The 6 underground main generators are also in operation as of May 23 , 2012 when the last main generator, No. 27, finished its final test.
The first 5 generators were eluted with 1 M HCl, and the last 2 generators with 0.6 M HCl.
Area four includes last ten generators and 15% of the total load demand.
We therefore took eluate samples after (1) 1 week after last elution of the generator, (2) 1 day after last elution of the generator and (3) 3 h after last elution of the generator.
The N.R.C. later decided to conduct the in-depth inspection of Indian Point 2 after learning that the last inspection of the generator, in 1997, had been done wrong.
It will be beneficial for the stability of wind power integrated grid when the generator can last 0.3 s to 0.6 s at very low voltage.
A generator can last for decades but it needs proper maintenance.
The fuse generally acts within 0.1 s and the generator has to last at least 0.1 s at voltage of 0.05p.u.
"We were told and we believed that our generators would last six days, and of course they died after two and one-half days, whether because they shorted out or were flooded," he said.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com