Your English writing platform
Discover LudwigSimilar(60)
This situation poses challenges for water resource planning and management.
Enterprise resource planning?
WorkMarket is a labor resource platform.
Resource planning is paramount to healthy growth.
Multiply the hourly rate for each required labor resource by the number of hours required.
Already growers are beginning to cooperate with nearby operations to plan and schedule for sharing labor resources.
Therefore, with such material related information, development of a systematic optimization methodology is much desired to derive a plan which optimally allocates limited labor resources in coping with the dynamic supply chain of materials.
This undervaluation of resources, including labor resources, further amplifies the cost advantage of made-in-China.
Therefore, in the planning of an industrial modular construction project, material availability and material use need to be taken as extra constraints in addition to limited labor resources and fabrication sequences.
Which means resources must be extracted from the ground more efficiently, and labor resources extracted from the workforce more ruthlessly.
Plus, it cuts costs to pool their beans, labor resources, finances and equipment.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com