Your English writing platform
Discover LudwigExact(9)
Motivated by a bottleneck operation in a multi-layer ceramic capacitor production line, we study a scheduling problem of batch processing machine in which a number of jobs are processed simultaneously as a batch.
The operations of all jobs are processed on both machines in batches.
The jobs are processed on one machine or parallel machines and delivered to the customer.
Print jobs are processed through CAS authentication at the device in order to print.
In a permutation flowshop design the machines arranged in series were the jobs are processed in a same order without eliminating any machine.
Once a job is processed in the first stage it enters a buffer where it may be moved to a specific location; when all jobs are processed in the buffer, the second stage commences its operations.
Similar(51)
TMalign and CE jobs were run under the master-slaves model, while USM jobs were processed by the master due to the negligible time required by these jobs.
When all of m components of each job are processed on the first stage machines, they will be collected and transferred to the assembly machine (i.e., third stage) by passing the second stage (i.e., transportation stage).
Once a job task is processed, the worker acknowledges the queue of accomplishing the task.
Moreover, for each job the labor requirement varies as the job is processed.
The default is 0, meaning that the job is processed using the latest version.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com