Your English writing platform
Discover LudwigSuggestions(1)
Exact(60)
The ITER cost estimation is estimated based on the component unit costs.
The mixture model is estimated based on the maximum likelihood estimation procedure.
All data is estimated based on a preliminary study.
Fatigue life is estimated based on the different approaches.
Then, the clock offset is estimated based on the CPF.
Probability range (dashed lines) is estimated based on Bayesian analysis.
Finally, a critical damping ratio for RWIV suppression is estimated based on the statistical analysis results.
The optimal number of adjective clusters is estimated based on the several criterion functions.
The aggressiveness of the surrounding vehicles/drivers is estimated based on their reactions.
A range of reliability for the sprinkler systems is estimated based on a number of considerations.
The solar irradiance received by the greenhouse is estimated based on isotropic clear sky analysis model.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com