Your English writing platform
Discover LudwigSuggestions(1)
Exact(16)
In [6], a combined system of PV and battery has been employed to supply customers who have been interrupted and the impact of DERs on the interruption costs have been calculated.
These data have been then used to determine the expected customer interruption costs on annual base.
The literature presents different methods to come up with sound calculations for these customer interruption costs.
Customer interruption costs are a function of both interruption and user characteristics.
Also, the impact on customer interruption costs associated with customer type, substation configuration, and feeder configuration are investigated.
With the aim of a precise calculation of operation and interruption costs, the load duration curve (LDC) has been established for modeling of the network loads.
Similar(44)
By formulating the cost due to interrupted KVA-hour, initial interruption cost, and modification cost in terms of component reliability indices, an optimization problem is derived while simultaneously considering multiple load points and feeder capacity limits, resulting in a nonlinear programming problem.
Reference [5] considered maintenance and interruption cost of transmission network in objective function.
In this reference, interruption cost is divided into dominant loss and recessive loss.
In the second experiment, we found that the difficulty of the interruption task did not modulate the interruption cost.
The total cost including the apparatus investment cost and the system interruption cost, is the objective function to be minimized.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com