Exact(15)
Coupled with the current density prior to current interruption, i(t = 0), the procedure enables both the double layer capacitance and "iR" drops to be determined.
A large methanol reservoir in a hexagonal shape is considered in designing the stack in order to increase the DMFC operation time without any interruption, i.e., to refill the methanol solution.
RFAR aims to maximize the network's 'robust throughput' which depends on the idea that more credit should be given when a session is completed without interruption, i.e., without violating its QoS requirements for its entire intended duration.
The probability of re-entering treatment after an interruption (i.e. having a new document of entry to treatment) was calculated from the date of the first "end of treatment" document registered for each patient.
For the modified-dosing schedule (arm II), axitinib was given on days 2 through 19, followed by a 3-day interruption (i.e. 2 days before and the day of chemotherapy), except the last cycle, during which it was given on days 2 through 21.
Pardon the Interruption I had a consultation with a psychiatrist recently.
Similar(45)
We present an experiment based on prior work where mediated interruptions (i.e. smart interruptions that should interrupt at opportune moments) were missed by participants when sent at one of two pre-defined breakpoints.
In WordCount, the sequentiality of the reads is preserved due to the displacing of interruptions, i.e. large number of small writes, which would have contended for HDD I/O time.
Aside from the obvious culprit for interruptions, i.e. lightning, and ground or line-to-line faults caused by vegetation and/or wind, the effects of common weather conditions on power reliability events have rarely been addressed and, even then, only broadly; that is, as a variable with few states such as fair, cold, windy, or raining.
In general, short dose interruptions (i.e., 2 5 days) of trial drug were recommended for the management of adverse events.
Table 5 Comparisons of day-ahead schedules of Scenario I and Scenario II Parameters Power purchase from wholesale electricity market Load interruption Sum I II I II I II Energy quantity (MWh) 525.876 525.193 7.516 8.197 533.492 533.4 Corresponding cost (DKK) 276686.0 276686.0 4510.0 4918.7 276686.0 276686.0.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com