Your English writing platform
Discover LudwigSuggestions(5)
Exact(3)
It was made by integrating the construction information such as project schedule, work flow, site access, resource, and time to simulate the construction sequence.
Regionally developed Load and Resistance Factor Design (LRFD) recommendations for bridge pile designs are enhanced by integrating the construction control capability of dynamic analysis methods and the recently developed pile setup quantification method in the calibration process.
In summary, the two approaches to foresight (i.e., prediction and inventiveness) co-exist in the practice of the company: their programmable and predictable future-creating operation provides a solid basis for organisational operation, thus integrating the construction and fathoming of the future into everyday practice.
Similar(57)
The framework, which integrates the construction organizations in construction supply chain and multiattribute negotiation model into a multiagent system (MAS), provides a solution for supply chain coordination in construction through multiattribute negotiation mechanism on the Internet.
By integrating the design management and construction planning toolkits, Autodesk created a more integrated offering for customers.
Assisting the Ministry of Education integrating the Child Friendly School concept into construction of all tsunami-affected schools.
However, one challenge of scenario construction is integrating the knowledge of both science and practice for a better understanding of the complex interactions between impact factors in the urban fabric.
Further, the control method not only can draw on expertise from the aforementioned fields but also can assimilate EVs into the power system, while sharing mutual benefits from the start by integrating the objectives and principles of construction, so as to better use the power system to support and promote EV development.
Delays in construction and integrating the enhancements meant that the carrier was not commissioned until 1955.
In the next step, the prepared data is integrated into the construction schedule.
Safety is integrated with the construction management process throughout the project life cycle.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com