Your English writing platform
Discover LudwigSuggestions(2)
Exact(1)
Furthermore, Polish membership in the European Union since 2004 has offered pastoralists the opportunity to apply for trademark protection under the European Commission's geographical indicator scheme.
Similar(59)
Specific recommendations are advanced about the inclusion of safety indicators in performance indicator schemes.
Criteria and indicator schemes are termed procedural policy tools as they combine various procedural instruments.
This paper explains why nine criteria and indicator schemes for forest management are little used instrumentally to monitor sustainability, at most being used to structure reports or statistics, and why the schemes lack coherent designs, with only 29% of indicators in five schemes suited to practical monitoring.
The frequency-domain channel length indicator (FCLI) scheme [20] requires only one snapshot channel estimate while a prior information of noise power is assumed to be known, but FCLI becomes impractical as CFO exists.
The difference between MM and MIMO architectures is that the former one applies one separate and independent fuzzy rule-based (FRB) classifier for each class and is using an indicator labelling scheme, while the latter one applies a single FRB where the rules are MIMO rather than MISO.
Indicator species schemes are burdened by shortcomings: some are experience based and flimsy in their definition of indicator goals, whereas others are scientific in their approach, but with disputable results or an irrelevant indicator goal.
Because the IEI approach is new, application should not be made without considering issues such as evaluation of the selection of the indicators, weighting scheme, uncertainties, and appropriate way to interpret the values.
When resources allocated scheme indicator are ia1, activation threshold can change the number of activated BSs in a virtual cell and affect the data rates.
The literature reveals that the institutional organisation of AESs can influence participation in the schemes and that this participation rate is an important indicator of the schemes' eventual environmental effectiveness.
Eighthly, we used fixed definitions of indicators, but within the QOF scheme some indicators changed over time (for example, the target for DM6 (HbA1controlol) varied from 7.0%to7.5%5%).
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com