Your English writing platform
Discover LudwigSuggestions(1)
Exact(1)
In 1848, a new dock office was built and the dock itself was upgraded to feature a hydraulic cargo handling hoist system, the first of its kind in the world.
Similar(59)
" The HC assistant handles the hoist with experienced hands.
Every hoist handling platforms, cages, or other devices used to transport persons shall be equipped with brakes capable of stopping the fully loaded platform, cage, or other device; with hoisting cable adequately strong to sustain the fully loaded platform, cage, or other device; and have a proper margin of safety.
The considered reference model of a Material Transportation Network (MTN), where several heterogeneous means of material handling, e.g. AGVs, hoists, lifts, etc., interact with each other via common shared workstations, enables the formulation of scheduling and re-scheduling tasks in the context of a Periodic Vehicle Routing Problem.
Lifting and Loading Machinery is also known as elevators, escalators, moving pavements, handling, telphers, conveyors, pulley tackle, hoists, winches, capstans, derricks, cranes, pneumatic.
If you get rocker rails instead rigid steel beams that protect the sides of the H2 from boulders you have to reach up for a grab handle and hoist yourself inside.
I grabbed the handle to hoist the bucket, and my father - age 88, going on 16 - tried to take it from me.
It can maximize the production efficiency by simultaneously and optimally determining: (i) the hoist movement schedule for handling different types of jobs with different processing recipes; (ii) the allocation of different processing units in optimal 2D spatial locations; and (iii) the assignment of multi-processing capacity to most needed processing units.
This paper investigates the hoist scheduling problem, a specific material handling issue, in a manufacturing environment.
The ship was provided with a powder-handling room above the shell room to mimic the arrangement that turret's hoists were designed to handle, and another set of hoists moved the propellant charges from the magazines to the powder-handling room.
The bridge was put out of commission at about 6 30 P.M. on Wednesday when sleet de posited more ice on the bridge than the structure's electric hoisting gear could handle.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com