Sentence examples for for surface facilities from inspiring English sources

Exact(2)

Amec Foster Wheeler has received a detailed design and engineering contract from Sasol Petroleum Mozambique Ltda for Phase 1 Tranche 1 of the production sharing agreement development for surface facilities, located at Temane, 600 km north of Maputo in Mozambique.

For surface facilities, some large, under-utilized flow lines can be converted to dual-service by putting a second pipe through the large line (i.e., flowing produced water in the inner line and gas in the annulus).

Similar(58)

The accurate prediction of diffusion coefficients of methane in liquid hydrocarbons is one of the key parameters for improving the prediction of compositional oil reservoir simulators, for designing surface facilities, and for high pressure gas/liquid mass transfer operations.

This means each reservoir's production profile which is based on uncertain input parameters and imperfect reservoir models forms the sizing basis for the surface facilities.

If there is an optimized integrated model for tubing and surface facilities, it can not only be used for investigating the fluid flow behavior but also it can prolong the lifetime of the entire production unit.

Reservoir and production engineers rely on phase behavior and pressure-volume-temperature for reserves, calculations, and surface facilities design.

Undesired chromatographic separation of polymer and a foaming surfactant in the reservoir, Additional surface facilities for polymer hydration, Limited temperature and salinity tolerance and pH sensitivity of most commercially available polymers used for enhancing foam performance.

This surfactant overcomes several disadvantages of polymer enhanced foam such as: (1) Undesired chromatographic separation of polymer and a foaming surfactant in the reservoir,   (2) Additional surface facilities for polymer hydration,   (3) Limited temperature and salinity tolerance and pH sensitivity of most commercially available polymers used for enhancing foam performance.  .

This parameter will be determined before any field trial, because it is important for operator to plan suitable surface facilities and to develop injection conditions.

A couple years ago, Rio Tinto signed a land use lease with the State of Michigan to build surface facilities and a portal for their mine.

Proper design of separators for surface production facilities is essential in order to maintain the quality and quantity of produced hydrocarbon fluids and avoid major operational problems in downstream equipment.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: