Exact(3)
Function fitting was completed in MATLAB using the Palamedes toolbox (Kingdom and Prins, 2009; Supplementary material).
Curve fitting was completed by GraphPad Prism 4 as described previously [1].
Parameter fitting was completed using the model independent parameter estimation tool (PEST) [ 31].
Similar(57)
After fitting was complete, the following postprocessing was performed in MATLAB (MathWorks).
All statistical analysis and linear fits were completed using Prism software (GraphPad Software, San Diego, CA, USA).
Fitting out work was completed much more quickly, however, and she was commissioned into the French fleet on 14 March 1891.
She was launched on 4 March 1908, and fitting out work was completed in time to begin sea trials in January 1911.
She was launched on 6 February 1937 and fitting out work was completed two years later in April 1939; the ship was commissioned into the Kriegsmarine on 29 April 1939.
After fitting out work was completed, Friedrich Carl was commissioned into the Navy on 12 December 1903, a month before her sister ship.
Space and weight was reserved for one catapult and its seaplane, but they were not fitted until after she was completed.
Space and weight was reserved for one aircraft catapult and its seaplane, but they were not fitted until after she was completed.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com