Your English writing platform
Discover LudwigSuggestions(1)
Exact(14)
( bar{U}_{s} ): Maximum quality level of existing facility s of the leader firm.
g s : Revenue of closing an existing facility s of the leader firm.
Minimum quality level of existing facility s of the leader firm.
Distance between existing facility s of the leader firm and demand point ( j ).
d sj : Distance between existing facility s of the leader firm and demand point ( j ).
For new facility s, the potential location k with the highest probability is selected and the new facility s is assigned to this location if there is a vacant position in this location.
Similar(46)
0.40 0.54 0.54 Distance from historic/cultural facilities (S) S.&AP.
An investigation of these materials in the context of accelerators is being carried out by IIT and the Argonne Wakefield Accelerator Facility [S. Antipov, W. Liu, W. Gai, J. Power, L. Spentzouris, AIP Conf. Proc.
Because direct liability for the parents operation of the facility must be kept distinct from derivative liability for the subsidiarys operation of the facility, the analysis should instead have focused on the relationship between CPC and the facility itself, i.e., on whether CPC operated the facility, as evidenced by its direct participation in the facilitys activities.
The facility's commander, Maj.
The facility's managers quickly cut costs.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com