The turnover is not likely to happen until 2002, with the expected completion of the basement theater, which will be named the Judy and Arthur Zankel Hall.
Elected officials are counting on the expected completion of the factory in 2011 to provide a major boost to the ailing upstate region, where for years they have promised, and mostly failed, to deliver an economic resurgence.
"Together with earlier than expected completion of key divestitures, this is providing a significant boost to our fiscal 2007 results".
From Ed White's first spacewalk in the June of 1965, to the first steps on the moon in 1969, to the expected completion of the International Space Station (ISS), the ability to exist, live and work in the vacuum of space has stood as a beacon of what is possible.
Upon the expected completion of participant follow-up in 2009, the ACCORD trial should document for the first time the benefits and risks of intensive glucose control, intensive blood pressure control, and the combination of fibrate and statin drugs in managing blood lipids in high-risk patients with type 2 diabetes.
In March 2012 it was announced that in October the same year T4 is to break ground, with an expected completion of date of July 2014.
Similar(43)
One hundred days is too short a time to expect completion of a reconstruction project of this magnitude, but surely it is ample time to see the first inklings of what, if any, long-term strategy exists.
The calculation of the expected completion time of S2HNC consists of determining the state of C1 after exactly M steps (i.e., M network uses) starting from (0,0) and the expected number of additional steps that are needed for C2 to transit from that state to (M, M).
This paper focuses on the calculation of expected completion probability of any repetitive construction project within a specified/certain duration (contract duration) by using Line Of Balance technique (LOB) in case of single or multiple number of crews integrated with Program Evaluation and Review Technique (PERT).
Using a 95% CI for the proportion of eligible patients who complete the assessment form, a margin of error (ME) of 0.05, a lower bound of this CI of 0.70, and an expected completion rate of 75% based on an educated guess, the required sample for the pilot study would be at least 75 patients.
Full construction has begun as of August 18 , 2011 with an expected completion date of 2014 for the first phase and 2015 for the remainder of the parkway.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com