Your English writing platform
Discover LudwigExact(4)
This operating mode allows reduction of discontinuities of excavation in order to obtain greater efficiency by reducing the excavation time.
Similarly, if the crater excavation time can be estimated to an accuracy of δT, the inferred strength from Eq. 3 can be measured to an accuracy δσc/σc ∼ 0.75δT/T.
Although research is still ongoing on this topic, many of the fundamental relationships between impactor or explosive energy and the resulting crater size, speed profiles, excavation time, and other resultants are now well known.
These results will assist with the design of conservation and management programs, such as in natural habitat conservation, setting the excavation time interval for resource regeneration and the substitution of cultivated for wild plants.
Similar(56)
Created for a producer who wanted Mr. Gutierrez to choreograph a work using video, "myendlesslove" is another personal excavation, this time inspired by a terrible breakup.
In a 2006 renegotiation that designated Mr. Silverstein the builder of four towers at the trade center site, the authority insisted that construction be completed within five years, and in turn, Mr. Silverstein won the promise of penalties if the authority failed to finish its excavation on time.
There were no case studies which compared the detailed excavation cycle time used in design studies with the actual results from an excavation taking into account each excavation cycle operation and task.
Actual times to perform three operations, drill and blast, muck removal and concrete lining emplacement were much larger than expected and represent the largest portion of the total excavation cycle time and had the largest impact on the efficiency of the excavation cycles and schedules.
If generally small and well preserved objects are directly recovered during an archaeological excavation, this time an indirect extraction has been carried out: as the find, part of the grave-good, was quite complex and fragile, a large soil block with dimensions 40 × 15 × 10 cm3 has been removed (Figure 1).
Realistic and properly planned excavation cycle times developed prior to tunnel construction are an important issue for dependable project management, including cost estimation and time saving.
In a 2006 renegotiation that designated Silverstein the builder of four towers there, the authority insisted on a five-year limit for the completion of construction, and in turn, Silverstein successfully negotiated for penalties in case the authority failed to complete its excavations on time.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com