Your English writing platform
Discover LudwigSuggestions(1)
Exact(16)
The first is appropriate for the quick estimation of costs in the early stages of project evaluation, while the second method can be helpful in the feasibility study stage.
Common contour binning was employed for hydrocarbon prospect evaluation, while the seismic coloured inversion was also applied for net pay evaluation.
Half have gained positions as either clinical instructors or assistant professors at UCLA, with the possibility of becoming fully tenured associate professors upon evaluation, while the remainder have gone on to successful positions all over the world, mostly in research.
Based on the amount of time administrators reported spending on each observation, and the average number of observations performed by each administrator, the typical elementary administrator spent 120 hours (the equivalent of two full weeks) solely on teacher evaluation while the average high school administrator spent 168 hours (or roughly three full weeks).
In 4 of these patients, the FVC remained within normal range values until the last evaluation, while the other two showed a progressive worsening and fall of the FVC that reached 45% predicted in one patient and 50% predicted in the second after 24 months.
Three classes were included in the first-semester evaluation, while the second semester included two classes.
Similar(44)
The project under evaluation while addressing the basic services also reflected positively on improving the environment and consequently improving the lives of ordinary people.
The testing requirements are therefore judged to be the minimum necessary consistent with a reliable evaluation, while at the same time minimising the amount of animal testing, as well as limiting the overall expense of the testing.
This way we were able to obtain sufficient number of spike responses for statistical evaluation while limiting the risk of degrading the cell due to overstimulation.
The MEQ dimensions overall interest, valence and distraction predicted immediate evaluations, while the long-term evaluations were determined by interest and high scores on the personality traits agreeableness and conscientiousness.
All pre-primary institutions under the Scheme should be accountable to their stakeholders by optimizing the school data by perfecting their planning cycle through on-going process of self-evaluation, while the government should monitor the state of education at both the national and district levels.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com