Your English writing platform
Discover LudwigExact(4)
The projected C emissions from biomass harvest, transportation, and electricity production for the amount of biomass necessary to fuel 5 MW electricity production for 8000 operational hours (estimated operation for one year), was 20,510 Mg C. The calculated emissions from the coal reference system for 8000 operational hours was 10,580 Mg C (Figure 3).
The projected C emissions from biomass harvest, transportation, and electricity production for the amount of biomass necessary to fuel 5 MW electricity production for 8000 operational hours (estimated operation for one year), was 20,510 Mg C. The calculated emissions from the coal reference system for 8000 operational hours was 10,580 Mg C.
It has an estimated operation life of ∼5.8 full-power year (FPY) at 100 MWth and ∼33.3 FPY at 20 MWth and would be fabricated and sealed in the factory, installed below ground, to avoid direct impact by missiles or aircraft, and mounted onto seismic oscillation bearings to resist earthquakes.
Mean estimated operation time was 76 minutes (95% CI: 74 78) and the mean blood loss volume was 128 ml (95% CI: 119 136).
Similar(53)
Profiling and estimating operation counts for workload tasks can be considered time-consuming and hard.
After completion of the dam, the Corps of Engineers estimated that operation and maintenance of the project would cost $6.5 million annually, including $570,000 for replacement power equipment and $2 million for the maintenance of fish and wildlife facilities.
To run a full simulation, it would take an estimated 100 trillion operations per second, and the computer that can do that won't be built for years.
Therefore, the online detection of the gas components in the GIS is essential and significant to estimate the operation state of power system.
By integrating the power loss of all feeders, the power loss of the entire distribution system can thus be obtained to estimate the operation efficiency of the Taipower system.
This study estimates the operation time periods of interim storage facilities with regard to the re-racking plan of spent fuel storage pools and construction of new nuclear power plants.
Based on Centerra's estimates, operations at Kumtor will cease in 2026 – fewer than 10 years from now.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com