Your English writing platform
Discover LudwigSimilar(59)
Assessors, Ms. Yancey also found, lacked essential equipment, items as basic as phones and tape measures.
The small quantity sales rule applies especially to heavy equipment items like construction machinery and trucks.
This should not require the revision of the flowsheet structure and of the basic equipment items.
Also, this model allows the incorporation of new equipment items in different periods.
They are usually un-spared, and are considered as critical equipment items.
Important optimization variables are the scheduling, operating conditions and the sizes of the equipment items.
The model also allows the incorporation of new equipment items at different periods.
For equipment items there is no additional cost to departments for this service.
Continuous domain MILP mathematical models were presented in determining simultaneously the orientation and allocation of equipment items.
Larger equipment items can be purchased in time by the Libyan government when their oil flows resume.
Exergy analysis was conducted to calculate the lost work for main equipment items used in the AP-X process.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com