Your English writing platform
Discover LudwigExact(60)
An investigation on the structural and mechanical equipment performance was performed by testing a scaled model to determine discharge capacity and head losses.
Having finalized installation of the new technology L1, L2 reference equipment performance tests were performed.
The advantages of this method are that it can produce large volumes of results at no more cost and it is very cheap to perform parametric studies, for instance, to optimize equipment performance.
The equipment performance is also discussed.
Regulations published under §§ 1020.30, 1020.31, and 900.12 e) of this chapter that are relevant to equipment performance should also be consulted for a more complete understanding of the equipment performance requirements.
Equipment Performance Check: Evaluation of the wash cycle of a milking system in order to troubleshoot problems.
Standards should include performance of electronic equipment, performance of communications equipment, and installation practices.
This increase can contribute towards achieving high equipment performance, which is a necessity for the realisation of digital manufacturing.
This complexity of flow processes has led designers to rely on empirical equations for predicting the equipment performance.
Equipment performance analysis by means of key performance indicators is a prerequisite step before undertaking any optimization or improvement measure.
Their low outlet densities cannot distribute the incoming process stream uniformly and efficiently, which consequently undermine the overall equipment performance.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com