Sentence examples for engineering bedrock from inspiring English sources

Suggestions(1)

Exact(60)

We could not detect the engineering bedrock at these sites.

Only two sites (T42, T43) showed the engineering bedrock (~740 m/s) in this group.

The S-wave velocity of the engineering bedrock was between 750 and 930 m/s.

The engineering bedrock was not revealed at T08 and T11 in group c and f, respectively.

The engineering bedrock S-wave velocity is Vs = 780 m/s.

In this study the velocity of engineering bedrock is assumed as 760 m/s.

The engineering bedrock velocities in the study area ranged from 700 to 930 m/s.

The average S-wave velocity of the engineering bedrock was 780 m/s in the region.

The engineering bedrock velocities ranged from 700 to 930 m/s.

We did not observed engineering bedrock beneath the other 13 sites.

Since we determined the depth to the engineering bedrock at 29 sites, we used a common half-space layer for each site as the engineering bedrock with an average Vs of ~780 m/s.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: