Similar(60)
By filing bogus electricity schedules, Mr. Belden and his co-conspirators could artificially increase congestion on California transmission lines; then, they would be paid to "relieve" the congestion, which did not exist.
Load transfer costs: user change electricity schedule during peak load period, and will change planning in advance (industrial and commercial users) or change schedule (residential customers).
The uncertainty caused by the intermittent nature of renewable energy resources is a significant challenge to electrical grid reliability and electricity generation scheduling.
The resulted electricity consumption scheduling problem aims to determine when and how much electricity to consume in each time period for each home appliance within the scheduling window to minimize customer's electricity bills.
For each customer (k in {mathcal{K}}) and each appliance (s in S_{k}), we define an electricity consumption scheduling vector: varvec{x}_{k,s} = left[ {x_{k,s}^{1}, ldots,x_{k,s}^{h}, ldots x_{k,s}^{H} } right] (7 where (x_{k,s}^{h}) represents the electricity consumption of appliance (s) at hour (h) for (k -th customer.
Finally, for each customer k in {mathcal{K}},triangleq,left{ {1,2, ldots,K} right}), the optimal electricity consumption scheduling problem for the whole household with smart meter can be modelled as: { hbox{min} } left( {F_{{C_{k} }} + F_{{S_{k} }} } right) (16).
For each customer (k in {mathcal{K}}) and for each curtailable appliance (c in C_{k}), we define an electricity consumption scheduling vector as follows: varvec{x}_{k,c} = left[ {x_{k,c}^{1}, ldots,x_{k,c}^{h}, ldots x_{k,c}^{H} } right] (12).
On the day the electricity is scheduled to start, the Pardeshis talk about what they'll purchase for their house.
The pilot power plant has been designed in order to produce electricity with scheduled profiles according to weather forecast.
The system can also be used to monitor electricity consumption, schedule and time appliances, and set up device alerts and notifications.
The 25-year PPA for 200 MW of auctioned solar PV was signed for the second phase of the solar park development at a record low price of USD $0.0584 per kWh with electricity offtake scheduled to start in 2017.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com