Your English writing platform
Discover LudwigSuggestions(4)
Exact(3)
Moving the most widely anticipated show of the New York collections to its finale could have a domino effect on the schedule, including of those shows that follow in London, but this is unlikely if the storm does not delay many others.
Here the results, show that curve is almost same for 10 to 13 sidings with curves of 12 and 13 sidings lying exactly on each other, strengthening the conclusion of previous discussion that sidings Kaliamawan, Sohawa, Ratial and Kalagujran have a very little effect on the schedule.
"When a task cannot be partitioned because of sequential constraints, the application of more effort has no effect on the schedule.
Similar(57)
In the case of Interstate, a Sanitation Department spokesman said the investigation would have no effect on the scheduled closing of the landfill in December.
Similarly, there is no significant effect on the schedules of self‐employed workers and highly specialized white collars.
The closed-loop LPV system matrices are factorised such that the effect of the scheduling parameter on the IFT gradient estimates can be compensated.
Robust pro-active scheduling focus on building predictable schedules; the key idea is to improve the predictability of the schedules in a dynamic environment (e.g. by inserting additional time in the predictive schedule) with minimal effects on the schedule performance.
Although the physiological effects of immunocontraceptive treatment with porcine zona pellucida (PZP) have been well studied, little is known about PZP's effects on the scheduling of reproductive cycling.
Our method is based on partially swapping two planned routes in such a way that the effect on the planned schedule is minimal, if these disruptions are actually realized.
There is no significant effect on the working schedules of self‐employed (column 5).
But there has been little attention paid to the objective of minimizing activities' cost with the resource constraints that is a critical sub-problem in partner selection of construction supply chain management because the capacities of the renewable resources supplied by the partners will effect on the project scheduling.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com