Your English writing platform
Discover LudwigSuggestions(5)
Exact(2)
Those trains routinely operate at speeds of 150 to 200 miles per hour, and in 2012, the average deviation from schedule was a miniscule 36 seconds.
The full potential shown in Fig. 6 can only be exploited in case there is no deviation from schedule as delays require train drivers to abandon energy-efficient operation and resort to a driving technique that minimises travelling time.
Similar(58)
It is critical to obtain the earliest possible warning of any deviations from schedule or budget – positive or negative.
Because of the variation between studies in the time points used for laboratory evaluations and deviations from schedules, time windows were defined.
Predictive-reactive scheduling scheduling/rescheduling is triggered by the real-time events where both objectives of interest and stability (measured by the deviation from original schedule) are considered.
The model accounts for fixed and variable costs of direct marketers, i.e. fixed costs represent office rents, IT and staffing costs and annual charges for trading, whereas variable costs refer to the amount of traded electricity and expenditures for electricity generation forecasts and balancing power needed in case of deviation from generation schedule.
If feed volumes are withheld or there is any deviation from the schedule in Tables 2 and 3 then the clinician is free to either start again from day 1, re-start at the volume previously tolerated then increase as scheduled daily, or hold for one or more days at a certain volume and then increase as scheduled.
If a deviation from the scheduled day is desired, faculty must seek approval from the appropriate division dean.
Primary frequency control is an automatic governor response in proportion to the frequency deviation from the scheduled value.
Then, a flexibility cost function of FO is formulated that reflects the charging power deviation from the scheduled charging power in the form of a quadratic function.
The "area control error" (P ACE) calculation is based on the power exchange deviation from its scheduled (∆P) and the frequency deviation (∆f) from its nominal value, as shown in (1) and (2).
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com