Your English writing platform
Discover LudwigSuggestions(5)
Exact(5)
Fig. 5 Demolished materials classes.
Witness point 3 days Site after removal of demolished materials.
The main demolished materials are concrete and bricks.
On-site stockpiles need to be arranged for demolished materials for recycling in the works.
Waste can be distinguished from items of reuse, recycling, and disposal based on the types of demolished materials and waste management strategies can be developed accordingly.
Similar(55)
Demolished materials must be classified by recovered items for re-use in the works, for delivery to the principal, demolished material for recycling in the works or off site, dismantle for relocation and demolished for removal.
The abbey was used as a country house until the beginning of the eighteenth century, after which it was abandoned and partially demolished for building materials.
The vicus may have been abandoned by the mid-3rd century; this is supported by the excavated remains of some buildings that were demolished and the materials robbed for use elsewhere.
In 1839, when Sir Robert Abercromby commissioned the Aberdeen City Architect John Smith to build the present mansion, the old house was demolished but some materials were salvaged and used in the new house.
School buildings were demolished and educational materials looted.
A few years later, in 1538, the abbey was dissolved, and was quickly demolished, with the building materials reused in various structures across Leicester, including a mansion which was built on the site.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com