Your English writing platform
Discover LudwigSuggestions(1)
Exact(2)
Though some argue oil companies should fork out for decommissioning from their copious profits, Britain's remaining fields are pricey to develop and compete for investment with richer reserves elsewhere.
The chapter first reviews the whole process of decommissioning from a facility's permanent shutdown to site release, and strategic options.
Similar(58)
It is necessary to be able to gauge the costs of the decommissioning task from the earliest stages of the project (project definition, planning, and project initiation phases of the project lifecycle) through the implementation, commissioning, and operations works.
CASE is expected to be very useful for reducing the engineering time, minimizing human error, and enhancing the reliability of source term evaluations of decommissioning waste from CANDU reactors.
They hold up the decommissioning announcement from back in September and are all like, "See, Good Friday worked," without stopping for a second to think why this happily-ever-after little news bullet is showing up seven years after the fact.
In contrast to the pumped hydropower store, impacts from decommissioning and disposal are discernible and impacts from the production stage are larger.
The first move away from decommissioning as a precondition for negotiations was made by the Blair government after its election, swiftly followed by the IRA's 1997 ceasefire.The IRA's announcement revived hopes which seemed to be dying.
Those plants and some others are probably decades from decommissioning, because they are next to plants that are still operating and their owners have decided not to act until all plants at a site have been retired.
Part of the reason for the rise is that previous plans failed to include the cost of cleaning up the ponds and silos at Sellafield, and the method of decommissioning was changed from manual to remotely operated work to reduce risks to staff.
The EAC cites a study by Oxera, an economics consultancy, which estimated that at least £1.6 billion ($2.9 billion) of public money might be needed to ensure 8GW of new investment and replace the losses from decommissioning old reactors.The costs of nuclear power extend far beyond a reactor's operating life, too.
In June, British Energy, owner of eight of Britain's plants and part of the Three Mile Island plant in Pennsylvania, said it would take a $7 billion write-down for the 2002 fiscal year, mainly to cover costs from decommissioning its older nuclear plants.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com