Your English writing platform
Discover LudwigSuggestions(1)
Exact(3)
However, the deadline of task execution is important latency or performance parameter in Markov models.
D i =P i : the deadline of task τ i (message streams S i ) is equal to its period.
During DPM, it is also required that the deadline of task execution and performance are not compromised.
Similar(57)
Especially, a key problem in the hardware software codesign for real-time embedded systems is related to the time-bounded communication channel that guarantees the deadlines of tasks, as well as the timely delivery of messages exchanged between tasks.
The pressure of the deadline, of the task I had to complete, clarified my already numb condition.
The deadline of each task is assumed to be equal to its period (D i =P i ).
If it exceeds the deadline of the task, the DeadlineOverrun location is entered, otherwise execDone is entered and the process continues when the period is met.
Next, the sub-deadline of the task is calculated using Eq. 2 and assigned to the task (lines 12 13).
Given a task graph, this scheme seeks to minimize the total execution time by allocating ready-to-execute tasks to as many available cores as possible subject to the real-time deadlines of each task.
This information includes the location of input and executable files, the deadline for task completion and the previously mentioned task requirements.
The sub-deadline of the task t is then set as shown in line 7.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com