Your English writing platform
Discover LudwigSimilar(60)
Response duration was measured from the date of response to date of progression.
Response duration was calculated from the date of response confirmation to the date of disease progression.
The duration of a project's survival refers to the period between the date of its actual creation and/or its commencement and the date of its closure or cessation of its activity.
The date of database closure was 30 April 2012.
However, there was no significant difference between groups in the median overall survival at the date of study closure.
The start date of the study time horizon for a given area was either 14 days before the start date of LPM closure or the onset date of the first confirmed local H7N9 case in 2014, whichever was later.
Only children with a minimum follow-up time of 6 months before date of database closure were included in the study.
Length of survival from referral to the PCT to date of death or date of study closure (30 April 2000) was calculated and the population of study patients divided according to whether death occurred within 28 days of referral or not.
A child was defined as LTFU if their last date of contact with the clinic was >6 months before the date of database closure (30 April 2012), and they were not known to have died or transferred.
Where a reporter chooses YES when answering the question on ward closure, they are then prompted to provide the date of closure and reopening.
Active flight operations were terminated in October 1931, although the official date of closure of Dodd Field as an aviation facility has not been determined.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com