Your English writing platform
Discover LudwigSuggestions(2)
Exact(4)
Be sure that these nails will hold the top edge of the course of shingles immediately below.
Instead of cutting off all three tabs, you can also reverse the shingles for a starter course, so that the entire shingle with tabs turned upward are under your first course of shingles.
Each cut is needed to shift the slots of the shingles on the course of shingles a 1/2 tab from aligning with the slots in shingles above and below.
Bend the last course of shingles over the ridge, up to about 6 inches, and nail it onto the other side so that the roofing extends over the top of the ridge, where nails will be covered, leaving no exposed nails.
Similar(56)
If you are making your own starter shingles, cut the tabs off for the "starter course" (bottom row) of shingles.
Lay the second row of shingles.
Each row of shingles should overlap the one below it.
Nail a horizontal row of shingles over the drip edge.
However, the vaccine can reduce the course and severity of shingles.
Each roll of roofing takes the place of 3 courses of asphalt shingles.
Of course, the asbestos shingles of the original mansard roof could not be replaced, so hundreds of lead-coated copper tiles were installed.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com