Your English writing platform
Discover LudwigExact(41)
It will show you results by nearest location, cost, type of car or by vendor.
Afterwards, the required adapted cost type plan is designed through a requirements analysis of the digital engineering specifics and an outlook is given for the upcoming work and validation.
In this paper, we show that the manufacturer may deny the urgent supplier, allow only the low cost type or permit both cost types of the urgent supplier, which follows a threshold type policy.
As the urgent supplier owns private cost information (either low or high cost type) and the prime one is the wholesale price setter, the manufacturer should carefully design his sourcing strategy.
The evacuation indicators are divided into "benefit type" and "cost type," the greater benefit type indicators are better, and the smaller cost type indicators are better.
As for wind energy, it is currently the least cost type of renewable energy technology.
Similar(19)
A suite of parametrical cost estimation blocks are treated as Cost Primitives (CPs), which contain attributes such as cost types, cost driving parameters, and cost estimation relationships.
When both cost types participate, whether the manufacturer differentiates the urgent supplier is also threshold type controlled.
Eight of the estimates included both cost types.
Tables 1 and 2 summarise the values for different cost types and the corresponding exponents.
Table 4 lists the assumed prices of the different cost types.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com