Your English writing platform
Discover LudwigExact(7)
CA consists of two parts: contingency selection and contingency evaluation [1, 2, 3, 4].
Thus, a solid contingency selection procedure followed by contingency evaluation for a set of selected contingencies must be executed for proper control actions.
The results indicate that the hybrid (MLP-SFS) increases the precision by about 20%50%% and reduces the computational time around by 30%50%%, which is good for real-time applications, such as, security assessment and contingency evaluation.
This interpretation would be consistent with the above-discussed theory of the PINV representing a deficient contingency evaluation.
An overall right-sided preponderance of PINV has been found also in previous studies [ 30] and points towards a preferential involvement of the right hemisphere in contingency evaluation.
We hypothesized that ADHD children's contingency evaluation and their cognitive performance monitoring is disturbed, resulting in an increased PINV amplitude of ADHD children compared to age-matched healthy controls.
Similar(53)
As elaborated above, the detected increase of the prefrontal PINV-amplitude can be interpreted as a deficit in contingency-evaluation representing ADHD children's higher uncertainty about the correctness of their own actions caused faulty monitoring processes.
A method based on radial basis function neural network (RBFNN) architecture is proposed for fast and accurate post-contingent information evaluation, contingency screening and ranking.
This research adopted the Stake's Congruence Contingency Model for Educational Evaluation.
For statistical evaluation by contingency table analysis, it is advisable that expected numbers of gold particles should not be smaller than five and, again, this may influence the choice of compartments or numbers of sampled golds.
In this case study, two experiments are performed in order to evaluate the effect on the system operation including outages in the transmission network: Example 3 (Exp3) that estimates the system operation under normal conditions (without contingencies), and Example 4 (Exp4) that includes the evaluation of transmission contingencies in both power and gas grids.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com