Your English writing platform
Discover LudwigSuggestions(1)
Exact(1)
The conclusion of the work is a conceptual model of the system proposed, a definition of the contractors' construction management computer agents and a specification based on scenarios of how they would interact with design agents.
Similar(59)
The college offers nine degrees including engineering, computer science, construction management, design, distribution and logistics, industrial engineering technology, information and computer technology, and industrial technology.
These can include design, hydraulics, construction, earthquake engineering, soil mechanics, computer methods, construction management, structural mechanics, etc.
In the paper, on the basis of analysis on the flow and demand of geological drilling information, the overall scheme of drilling construction informatization is presented, and informatization technological plan of computer aided design and construction management on geological drilling is studied and provided.
He is a project manager at Quartararo & Associates, a construction management firm in New York.
This paper provides an integrated model of radio-frequency identification (RFID) and four-dimensional Computer-Aided Design (4D CAD) in construction management.
The development of computer and network technology provides a possibility for informationization of geo-drilling design and construction management.
The Building Information Model is a computer model database of building design information, which may also contain information about the building's construction, management, operations, and maintenance (Howell and Batcheler, 2005).
Recent advances in image processing and computer vision have led to new research on the application of image-based reasoning for various construction management tasks and techniques that can manually, semi-automatically, and automatically interpret them (Cheng and Chen 2002; Carozza et al. 2012; Golparvar-Fard et al. 20102010; Kiziltas et al. 2008).
Heery-Tishman, of Baltimore and New York, is providing construction management.
Mr. Spring, 30, is an executive vice president of T. Link Associates, a construction management business in Brooklyn.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com