Your English writing platform
Discover LudwigSuggestions(1)
Exact(5)
Information on proper use of scaffolding and PPE for construction is available on the EHS website.
Furthermore, a discussion about the results regarding the computational model construction is available.
The results, after making corrections to the original instrument and verifying the instrument's stability over time (test-retest analysis), makes it possible to affirm that the proposed objective has been achieved, and that an instrument with acceptable reliability and validity of construction is available.
A free software implementation of this construction is available in GNUnet.
A fuller description of the methods used for EQI construction is available in Additional file 1.
Similar(55)
The three new expression constructs were verified by sequencing and details of their construction are available upon request.
The starting dataset with all input data combined and the data processing code file for inter/extrapolation and for index construction are available at Data Citation 1: figshare https://doi.org/10.6084/m9.figshare.org/10.6084/m9.figshare
The sequences of primers used for plasmid construction are available upon request.
Also, both interim and permanent loans for home construction are available for up to 75% of the appraised value or a maximum of $800,000; interim financing is for 18 months at interest three-quarters of 1% above Cal Fed Savings' commercial banking prime and permanent loans are at a fixed rate of 123/4%% or an adjustable rate of 101/2%%.
Primers for plasmid construction are available upon request.
Primers used for vector construction are available in Table S1.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com