Used and loved by millions
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com
construction duration
Grammar usage guide and real-world examplesUSAGE SUMMARY
"construction duration" is a grammatically correct and commonly used phrase in written English.
It refers to the amount of time it takes to complete a construction project. Example: "The estimated construction duration for the new office building is two years."
✓ Grammatically correct
Science
News & Media
Alternative expressions(20)
Table of contents
Usage summary
Human-verified examples
Expert writing tips
Linguistic context
Ludwig's wrap-up
Alternative expressions
FAQs
Human-verified examples from authoritative sources
Exact Expressions
6 human-written examples
construction duration: 22 days time needed to dismantle: 7 days number of chickens used in photo shoot: 18 to 20.
News & Media
Due to increasing structural complexity and economic investment of super tall buildings in recent years, the construction duration prolongs.
Science
A quantitative methodology is herein formulated for estimation of the cost-effectiveness of dust suppression with chemical agents within a specified construction duration.
Science
In addition, the design described here can also be expected to significantly reduce both construction duration and operational requirements for maintenance and inspections.
Full-depth precast concrete deck systems have been increasingly used in bridge construction due to their high production quality, reduced construction duration, possible weight reduction, and lower life-cycle cost.
Science
These visual data can add up to a significant size throughout the construction duration.
Science
Human-verified similar examples from authoritative sources
Similar Expressions
54 human-written examples
It can improve the workflow continuity, increase the efficiencies in the use of resources, minimize construction wastes, and reduce the number of on-site contractors as well as construction durations.
The shortage of proper simulation programs for the preliminary design of sustainable construction prevents in fact the application of these systems in the contemporary construction market, oftentimes producing higher design costs and construction durations that exceed those of comparable standard buildings.
Science
Proposed model for predicting actual road construction project duration was developed; a real case study tested the accuracy of proposed model.
We identified future modeling directions and propose that the minimal epidemiologic dataset for Ebola model construction comprises duration of incubation period and symptomatic period, distribution of secondary cases by infection setting, and compliance with intervention recommendations.
Science
For a stable cluster construction, the CH duration should be relatively lesser with high trust level.
Expert writing Tips
Best practice
When discussing project management, clearly state the "construction duration" upfront to manage expectations and facilitate planning.
Common error
Avoid confusing "construction duration" with the overall project lifecycle. The duration refers specifically to the building phase, excluding pre-construction planning or post-construction activities.
Source & Trust
85%
Authority and reliability
4.5/5
Expert rating
Real-world application tested
Linguistic Context
The phrase "construction duration" functions as a noun phrase, typically serving as the subject or object of a sentence. Ludwig shows that it defines the length of time needed to complete a building project. It indicates a measurable period.
Frequent in
Science
50%
News & Media
33%
Academia
17%
Less common in
Formal & Business
0%
Wiki
0%
Reference
0%
Ludwig's WRAP-UP
The phrase "construction duration" is a grammatically correct noun phrase referring to the amount of time needed to complete a construction project. According to Ludwig, this phrase is commonly used in scientific and news contexts. The frequency is uncommon, but it's considered acceptable for formal and informal usage. Related phrases include "construction period" and "project timeline". It's important to differentiate the duration from the entire project lifecycle to avoid confusion.
More alternative expressions(6)
Phrases that express similar concepts, ordered by semantic similarity:
construction period
This alternative focuses on the time frame within which construction takes place.
project timeline
Replaces "duration" with a term indicating the entire schedule of the construction endeavor.
building timeframe
Uses "timeframe" in place of "duration", emphasizing the period allocated for building.
length of construction
Changes the structure to focus on the "length" rather than "duration" of the building process.
construction schedule
Broader term encompassing the planned dates and duration of all construction phases.
time required for construction
Rephrases the query to highlight the "time required", making it more explicit.
building phase duration
Highlights the duration of a specific phase within the overall building process.
construction lead time
This alternative is specific to the time needed before construction can begin, incorporating planning and preparation.
project completion time
Refers to the estimated or actual time it takes to finish the construction project.
time to build
Simplifies the phrase to the basic concept of the "time to build" something.
FAQs
How is "construction duration" typically estimated?
Estimation of "construction duration" usually involves analyzing project scope, resource availability, potential delays, and historical data from similar projects. Various project management techniques and software tools may be used to refine these estimates.
What factors can affect the "construction duration"?
Factors impacting "construction duration" include weather conditions, material supply chain disruptions, labor shortages, design changes, unexpected site conditions, and regulatory approvals. Efficient project management and risk mitigation strategies are crucial in managing these factors.
What are some alternatives to "construction duration"?
You can use alternatives like "construction period", "project timeline", or "length of construction" depending on the context.
How does prefabrication affect the "construction duration"?
Prefabrication can significantly reduce the "construction duration" by allowing components to be manufactured off-site concurrently with site preparation. This method often leads to faster assembly and reduces on-site labor requirements.
Editing plus AI, all in one place.
Stop switching between tools. Your AI writing partner for everything—polishing proposals, crafting emails, finding the right tone.
Table of contents
Usage summary
Human-verified examples
Expert writing tips
Linguistic context
Ludwig's wrap-up
Alternative expressions
FAQs
Source & Trust
85%
Authority and reliability
4.5/5
Expert rating
Real-world application tested