Your English writing platform
Free sign upSuggestions(2)
Exact(1)
The objective of the UC problem is to minimize the total production cost consisting of the generation cost and the start-up cost of the generating units under the circumstance where the operational constraints and the constraints of the generating units are satisfied in the scheduling period.
Similar(59)
Security constraints include the constraints of the bus voltage magnitudes and transmission line loadings.
Lawrence Livermore National Laboratory (LLNL), on behalf of the U.S.-China Clevaluatedy Research Centhe, has evaluatechnologychnology using location-specific economic parameters to reflect power generation loss from a coal-fired power generation plant due to amine regeneration, the necessary utility constraints and investment, and the constraints of the location.
These include the capacity constraint of charging lines, the capacity constraint of substations, and the constraints of charging devices [84].
Due to the limited disclosure of information, the participation constraints (and incentive constraints) of all the bidders are satisfied with respect to all information revealed by the mechanism.
Step 2: Based on demand forecast results, considering energy balance constraints and operating constraints of the whole system, minimize the total operation cost of the day to determine a dispatch schedule for all the controllable energy supplies.
The classes encapsulate the methods of setting up and solving the state equations according to the topological constraints and elemental constraints of resistor, capacitor, inductor and voltage and current sources.
This approach incorporates kinematics constraints, dynamics constraints, and control constraints of robotic manipulator.
In the SIMP method, the design variable is relaxed and bounded in the interval [0,1], and the evolution of the design variable is usually implemented by the method of moving asymptotes (MMA), which can be used to deal with optimization problem with multiple integral constraints and bound constraint of the design variable.
Indeed, the active power constraints of DERs and the constraint of load balance are only considered in this problem.
Outcomes were first estimated from diagnosis with no constraint, and secondly estimated with the constraints of actual clinical measures after five years of program participation.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.
Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com