Your English writing platform
Discover LudwigExact(12)
Xu et al. [133] propose MQMW, a Multiple QoS constrained scheduling strategy of Multi-Workflows.
Considering the uncertainties in prices, [20] developed a new risk constrained scheduling for VPPs to help the aggregator bid in the day-ahead market.
An enhanced resource constrained scheduling algorithm is used to determine the system performance.
The inherent extensibility, coupled with improved run times from a decomposition strategy, posit constraint optimization as a powerful tool for resource constrained scheduling and multiprocessor design space exploration.
The problems of energy and time constrained scheduling of precedence constrained parallel tasks on multiple manycore processors in a cloud computing environment are defined as optimization problems.
In this paper we consider a labor constrained scheduling problem (LCSP) which is a simplification of a practical problem arising in industry.
Similar(48)
In PROforma transitions between tasks can be constrained using scheduling constraints, however it is not possible to attach a guard condition to a scheduling constraint.
This paper introduces a convex and normally constrained hydrothermal scheduling method.
Resource constrained project scheduling is critical in logistic and planning operations across a range of industries.
In this paper, security constrained generation scheduling (SCGS) problem for a grid incorporating thermal, wind and photovoltaic (PV) units is formulated.
The resource constrained project scheduling problem (RCPSP) is widely studied in the literature and has a host of applications in practice.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com