Your English writing platform
Discover LudwigSimilar(60)
The opening of New Jersey Transit's Montclair Connection, scheduled for this spring, has been delayed until September or October, transit officials said yesterday.
Figure 3 D2D Link model for connection scheduling.
Figure 1 Frame structure for connection scheduling and D2D communication.
Finally, the greedy connection scheduling algorithm runs in O(R.T.D).
Figure1 shows the frame structure, illustrating the Tx block and Rx block for connection scheduling.
In the sequel, we will detail the connection scheduling procedure for FlashLinQ.
The common approach is to perform the VM placement and the connection scheduling separately or in two different consecutive steps.
This particular illustrative model will be referenced to explain a basic operational procedure for connection scheduling under consideration.
As for connection scheduling heuristics algorithms, Duration priority runs in O |R|.lg|R|+|R|.T.D) or O |R|.(1+lg|R|+T.D).
Moreover, a set of heuristic solutions are introduced and used as VM reservation and connection scheduling policies.
Therefore, we introduced 5 heuristic methods to tackle the two sides of the problem, namely VM reservation and connection scheduling.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com