Sentence examples for connection of wind from inspiring English sources

Exact(4)

Figure 4 shows a single-line diagram of a rural distribution network that facilitates the connection of wind plants.

For the central connection of wind farms, the lowest impact factor that provides the largest installed capacity is the maximum capacity that can be integrated into the network safely because it gives the least impact on the steady-state security yet absorbing a relatively larger installed capacity of wind.

For the decentralized connection of wind farms, the same rule can be applied, however, the impact factor due to large wind farms can be lower compared to central integration because of the ability of decentralized connections of wind farms to provide firm power outputs with auxiliary resources.

Although the Renewable Energy Law provides the legal framework to set out appropriate policy instruments, such as financial subsidy and taxation rebate, and technical guidelines to facilitate grid connection of wind power, the grid integration and consumption of wind power are still the critical issues to be resolved.

Similar(56)

Large-scale battery energy storage system (BESS) can effectively compensate the power fluctuations resulting from the grid connections of wind and PV generations which are random and intermittent in nature, and improve the grid friendliness for wind and PV generation grid integration.

It has the advantages of providing dynamic reactive power compensation ability and, improving the electric energy quality of Zhoushan Power Grid, reliving the grid connection problem of wind power fields in Zhoushan islands and improving the flexibility of the power grid dispatching and operation.

The case study that we considered concerns the connection of a wind farm sited in the center of Italy.

The current measured at the point of connection of a wind park to the public grid is a combination of the primary emission and the secondary emission.

A real case study concerning the design and connection of a wind farm placed near Collarmele, in the center of Italy, shows the effectiveness of the proposed methodology.

The connection of the wind farm to the existing collector SS named Collarmele placed on the HV power line going from Avezzano to S. Angelo.

To the authors' knowledge it is the first time that these techniques are applied for assessment of the grouted connection of offshore wind turbines on monopile foundations.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: