Sentence examples for concrete schedule from inspiring English sources

"concrete schedule" is a correct and usable phrase in written English
It is typically used to refer to a specific and detailed plan or timetable for the completion of a project or task. For example, "We need to create a concrete schedule of which tasks will need to be completed each day in order to finish the project on time".

Exact(2)

Asked on Sunday at a news conference what was the company's projected timeline for emerging from the crisis, Sakae Muto, a vice president for Tokyo Electric Power, said, "We don't have a concrete schedule".

But in comments Monday he appeared to back away from the deadline, saying the target was "not set in a concrete schedule".

Similar(58)

The next day, reinforcement bars, electrical conduits and plumbing pipes that will be encased in concrete are installed on that next level, and the forms are ready for the fresh batch of concrete scheduled to arrive the following morning.

Note that the analysis would be valid only for the concrete scheduling considered.

An adapted schedule generation scheme is used to map these to concrete schedules.

The HSPA rates depend on the instantaneous channel conditions; HSPA rates in a multi-user setup depend also on the concrete scheduling strategy considered.

Note that the instantaneous allocated powers and codes depend upon the concrete scheduling policy and, generally, they do not only depend on the instantaneous channels, but also on other factors.

Anyway, the conclusion is that the methodology that we present would be the same and that it could be adapted properly to the concrete scheduling, admission control, etc. schemes that are to be considered as a reference service.

For instance, if, in order to avoid overprovisioning of network resources, High-Speed Packet Access (HSPA) is considered, the following aspects should be taken into account: The HSPA rates depend on the instantaneous channel conditions; HSPA rates in a multi-user setup depend also on the concrete scheduling strategy considered.

The first pouring of concrete was scheduled for the project's eighth year, and work on the powerhouse would have begun in the 11th year.

With concrete examples of scheduling spaces, segments, and schedules for various multiprocessor network architectures, we showed that individual start reduces the computing period, and our algorithm can find the optimal computing period without exhaustive search.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: