Your English writing platform
Discover LudwigSuggestions(5)
Exact(1)
A notification e-mail is also sent to the user informing them of the completion of job and the final output of the query.
Similar(59)
During the completion of the job history, jobs that the participant had already filled in were listed on top of the page to remind the participant which jobs she had already reported.
(C_{j}) is the completion time of job j.
C i l : Completion time of job i at stage l.
Completion time of job n at stage t on machine k.
(d_j): the due date assigned to job j. (C_j): the completion time of job j. (f_j): the flowtime of job j calculated by (f_j=C_j-r_j).
According to the rule that each operation is scheduled at the earliest time, there are two variables, namely 1) Max {C ij } for all i as the maximum completion time of jobs on machine j and 2) Max {C ij } for all j as the maximum completion time of job i.
The analysis of famous benchmark problems led us to the conjecture that Λ⩽O(l+m) could be a uniform upper bound for the completion time of job shop scheduling problems with l jobs on m machines.
In stage 2 machine 1, job 3 is followed by job 1 because completion time of job 1 in stage 1 is less than the job 3 in stage 1.
The first step of Algorithm 2 is to calculate the sample completion time of job j (denoted SCT j ) as: {SCT}_j={s}_j+{SET}_j where s j is the earliest start time of job j (line 1).
Due date assignment rule is used to determine the due dates for arriving jobs by estimating the job flowtimes (the time taken from the arrival until the completion of a job).
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com