Your English writing platform
Discover LudwigSuggestions(5)
Exact(1)
Questionnaire completion is estimated to take approximately 10 min.
Similar(59)
Logistic regression is used to estimate the effect of being a transfer student, and the effects and interplay of factors such as socioeconomic background and institutional selectivity on bachelor's degree completion are estimated.
At this time, the completion was estimated to occur in 2004, at a cost of $151 million (about $in dollarss).
By April 1942, the Montana-class design had been approved; construction was authorized by the United States Congress and the projected date of completion was estimated to be somewhere between 1 July and 1 November 1945.
Interview completion was estimated to require a maximum of 20 minutes, a time determined as not burdensome in previous work with these families.
Recruitment will thereafter proceed at full rate until completion, which is estimated to be completed at the end of 2017.
The completion date is estimated October 2017 [ 75].
The data completion date is estimated December 2016 [ 97].
Completion of the GPPAQ is estimated to take approximately sixty seconds [ 8] and generates a simple, four-level physical activity index, categorising patients as: active, moderately active, moderately inactive or inactive.
Although build-out of the entire system is estimated for completion by 2034, by 2013, the Charlotte Area Transit System stated it would likely be unable to fund future transit projects apart from the Blue Line Extension, scheduled to begin construction in early 2014.
The completion date of the trial is estimated April 2016 [ 55].
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com