Your English writing platform
Discover LudwigExact(8)
Depending on its capacity and type, such a supply suitable for home computing can cost anywhere from $40 to several hundred dollars.
In district energy systems, the selected capacity and type of system is dependent on demand-side requirements, energy prices, and environmental costs.
As the design process requires expert knowledge in various technical fields, we assessed and compared the following: appropriate selection of integrated PV type, battery capacity and type, possible electronic circuitries for PV-battery coupling, and material properties concerning mechanical incorporation of PV into the encasing.
It is composed of: (a) Storage parameters which determine the available disk space, storage type, and number of storage units; (b) memory parameters which represent the size, capacity, and type of the available memory; and (c) CPU parameters which represent the information about the available processing unit(s).
Regional hospital capacity and type of hospital reimbursement did not have significant associations.
Intellectual capacity and type of education can be considered proxy measures of social class, because both these would lead to greater or lesser societal opportunities and occupational exposures.
Similar(52)
Our results suggest that the robustness depends not only on the connectivity of equipments removed but also on the capacity and types of links associated with that removal.
We sought information from the Environment Agency to identify new landfill sites in Wales opening from 1985 and licensed to accept commercial, industrial, and household waste; the dates on which they became operational; details of the site capacity; and types of waste accepted as described by the categories of the National Waste Classification Scheme 1999 (Environment Agency 1999).
Experimental results suggest that the methodology prescribes locations, capacities and type of technologies for new power plants in Texas that tend to maintain their prescribed values of cost and water withdrawal when facing unforeseen implementation conditions, while satisfying the required generation capacity.
Second, it is assumed that there is uncertainty regarding the demand of electricity because each power plant often take decisions about electricity planning, capacities and type of sources long before the real demand of electricity are resolved.
The time it will take to complete the format will vary depending on your card type, capacity, and format type.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com