Sentence examples for buildings a benchmark from inspiring English sources

Exact(1)

For investigation of the effects of building corner modifications on reduction of wind loads on high-rise buildings, a benchmark square model and three corner modified models including recessed, chamfered and rounded are tested by pressure measurements in a boundary layer wind tunnel.

Similar(59)

OPENED in 1854 as the Astor Library, the Joseph Papp Public Theater is both one of New York's oldest public buildings and a benchmark 1960's preservation project.

The developed transient code concurrently solves three tailored dynamic models of each involved sub-system, namely: building envelope (a benchmark room defined by ISO 13791), radiant floor (designed in accordance with EN 1264-2), and heat pump (an air-to-water electrically-driven modulating unit).

A reference EUI database for apartment buildings and a benchmarking tool based on this database will be made available after 2020, and similar systems for office buildings are now being established.

In order to improve the energy performance of buildings and provide a benchmark for comparison, ASHRAE/IESNA has issued Standard 90.1 Energy Standard for Buildings except Low-Rise Residential Buildings. Low-Rise Residential Buildings

Simulation results from a 3-storey linear damped shear building, an ASCE benchmark structure and a two-storey planar frame structure are used to validate the proposed method for both time-invariant and time-varying system identification.

The principal aims of the experimental program were to establish the diagonal tension strength of the vintage clay brick URM walls present in the two buildings and to establish a benchmark mortar mix suitable for use when manufacturing replica clay brick test assemblages that adequately represent the strength characteristics present in vintage URM buildings.

A benchmark building and a design optimization problem are also developed.

One numerical example is presented to verify the validity of the formula; numerical simulations are compared against literature data (wind tunnel test results) for a benchmark building structure.

A three-storey moment frame building is considered as a benchmark problem in order to demonstrate the efficiency of the proposed optimization scheme.

Performance evaluation of the controller is carried out in a simplified model version of a benchmark building system, which is recognized as a state-of-the-art model for numerical experiments of structures under seismic perturbations.

Show more...

Ludwig, your English writing platform

Write better and faster with AI suggestions while staying true to your unique style.

Student

Used by millions of students, scientific researchers, professional translators and editors from all over the world!

MitStanfordHarvardAustralian Nationa UniversityNanyangOxford

Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak quote

Justyna Jupowicz-Kozak

CEO of Professional Science Editing for Scientists @ prosciediting.com

Get started for free

Unlock your writing potential with Ludwig

Letters

Most frequent sentences: