Your English writing platform
Discover LudwigSuggestions(2)
Exact(1)
Ikitsuki Bridge is a three span continuous truss bridge with a length of 800 m, which was completed in July 1991.
Similar(59)
The boats were level at the Crab Tree pub but here Cambridge began to draw ahead and passed under Hammersmith Bridge with a length-and-a-half lead.
Namely, for short bridges (with a length ratio below the order of 1.5), well-distributed frequency peaks occur at a number of dominant frequencies, whereas for longer bridges the main frequency peak tends to concentrate towards the lowest dominant frequency.
The bridge is one of the world's longest cable-stayed bridges, with a length of 1010 m.
For illustration purposes, a nine-span case-study bridge with a total length of 430 m is considered.
The heuristic optimization algorithms are applied to a bridge with a span length of 35 m and a width of 12 m.
Hence, the benchmark bridge is a two-span concrete box girder bridge with a span length of 40.85 m.
The bridge specimen was a precast PSC curved two-girder bridge with a span length, deck width, and average curvature radius of 40, 5, and 100 m, respectively.
The bridge is a continuous bridge with an overall length of 700 m and constituted by 7 spans of 90 + 5 × 105 + 85 m.
The Queensferry Crossing is being constructed as a cable-stayed bridge, with an overall length of 1.7 mile.
The crews exchanged leads with Oxford shooting Hammersmith Bridge with a half-length advantage.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com