Your English writing platform
Discover LudwigSuggestions(2)
Exact(2)
Southern said it had put 119 trains back into its temporary weekday timetable, restoring the entire inner London metro service so that almost all London Bridge peak trains are now running, and tripling the number of trains operating on the West London Line.
Using a nondimensional formulation, the key parameters that determine the reduction of the bridge peak response in terms of accelerations and displacements due to train-bridge interaction are brought to light.
Similar(56)
The longer the body of a plane, the more accurately it will straighten wood, as the length of the body allows the plane to bridge peaks and troughs in the wood's surface.
They trundled toward the bridge's peak.
With 36 trains a day now going over the bridge during peak times, compared with 27 before, average weekday ridership over the bridge is up nearly 19percentt, while on slower routes that go through tunnels into Lower Manhattan, it is down 28percentt on the M and R trains and 16percentt on F trains.
From Monday 22 December to Christmas Eve some Southeastern Charing Cross services will not call at London Bridge at peak morning times.
D must be large enough to bridge any peak of speech activity, but short enough to follow nonstationary noise variations.
The bridge frequency peaks are, however, not easily observed, because pavement roughness often influences the spectra of vehicle responses.
Sure enough, in their new survey, they found that 53percentt of bridge riders during peak hours were on trains that headed up Broadway, compared with 47percentt on Avenue of the Americas trains.
Funding of £500m will go to reducing the visual impact of stretches of high-voltage transmission lines by replacing a total of 45 pylons with underground cables in three national parks – near Hale in the New Forest, near Dunford Bridge in the Peak District and near Porthmadog in Snowdonia – and the area of outstanding natural beauty (AONB) near Winterbourne Abbas, Dorset.
Results show that for a typical wall with insulation thickness of 75 mm, mortar joints with Hmj = 10 mm (4.8% thermal bridge area) increase peak, daily, and yearly cooling and heating transmission loads by 62%, while the wall R-value decreases by 38% compared to similar wall with no mortar joints (Hmj = 0).
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com