Your English writing platform
Discover LudwigExact(1)
As with the previous 2 x 6s, measure off from the bottom, drive in four nails, and space each one evenly.
Similar(59)
In 2015 the scale of income at the top and desperation at the bottom drives a coach and horses through any sense that the distribution is fair.
And the bottom line can drive that process, too.
As a matter of fact, bottom-up innovation can drive a company's next big business offering.
Packed mini-van buses, with their yellow painted tops and blue bottoms, drove through the dirty paved streets.
Table 8 Well startup order in the bottom water drive model Timing, min Well startup order 0 During2 10 L2 15 L3 25 L1 (4) During the bottom water drive, the water cut of Well L1 reached 98%% first.
It is well known that barriers have significant impact on the production performance of horizontal wells developed in a bottom water drive reservoir.
The results show that, in bottom water drive, under the effect of bottom water depletion and water breakthrough, the wells had high productivity in early stage and fast decline.
Table 2 lists the bottom water drive reservoir properties and its drilling and completion parameters.
During the bottom water drive, the water cut of Well L1 reached 98%% first.
Hence, it is imperative to understand and analyze the practical production situations during bottom water drive.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com