Your English writing platform
Discover LudwigSuggestions(5)
Exact(8)
Flow mixing takes place depending on the abstraction regime, local hydrogeology, and borehole construction design and operation.
Further, new boreholes and those already operating could take advantage of fluoride solubility controls to reduce the F concentration in the abstracted water by considering lithology and borehole construction design in order to regulate groundwater flow conditions.
The cost of installing rainwater harvesting facility is far less than the cost of borehole construction and so is the energy requirement as well as greenhouse gas emission.
Further, several agencies including the government of Uganda have ended focusing on the delivery of 'hardware' (borehole construction, pans and dams) with limited attention given to 'software' (traditional institutions and management arrangements) (Stites et al. 2007; Kratli 2010; Czuba 2011).
This kind of disposition between cost recovery and service rendering combine with inadequate public investments and water price increases have not made the World Bank intervention in the borehole construction to yield the stated aim and desired results in Mekelle Water supplies.
However, tasks remain in ensuring continued quality of borehole construction and rehabilitation and handpump manufacture.
Similar(52)
As part of the project, the hardware component of the system was strengthened and expanded through rehabilitation of two boreholes, construction of an elevated water steel tank and installation of a 15-km new pipeline connecting 5 new water kiosks around the town with the water source.
But she is happy with construction of boreholes, building of classrooms and support for the health workers and health centres like Tiriri and Ojom.
The several reported cases of reduced borehole yields after construction might be caused by improper screen setting depths and displaced gravel packing combined with inadequate quality of the gravel pack material, which leads to partial blocking of productive water sections.
Participants in both focus groups and oral histories recalled that in the midst of this drought, the government introduced the programme Services to Livestock Owners in Communal Areas (SLOCA), a grant scheme designed to help small-scale pastoralists in the communal areas with water reticulation through borehole drilling and construction of drift fences.
The window of time for borehole drilling and construction work is limited to the dry season only in most project areas.
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com