Your English writing platform
Discover LudwigSuggestions(2)
Exact(1)
The problem of steady-state seepage flow underneath two intermediate filters located anywhere between two end cut-offs of a flat floor of a hydraulic structure on a permeable soil of a finite depth has not been previously solved.
Similar(59)
We defined two cut-offs.
Tie the two ends together and cut off any unwanted excess string.
Between these two cut-off values, no decision can actually be taken.
Use the wire cutters to cut one end off of the USB cable.
The other end can rest on one of the ends you cut off for extra cushion.
Using different survival end-points and chi 2 values for each cut-off level, two optimal cut-off points, at the 7% and 12% levels, were consistently obtained for the SPF.
We therefore apply two proposed cut offs.
To this end, we propose an iterated hypergeometric test applying varying cut-offs to the two lists.
Whereas the numerical solutions for cut-offs at four (blue) and five (green) excitations agree very well indicating that the cut-offs are high enough, one can see deviations between the numerical and the mean-field solutions as J increases.
SNPs calling was performed with varied two cut-off values which are minimum number of bp between SNPs (prune) and minimum number of bp from a sequence end (e).
Write better and faster with AI suggestions while staying true to your unique style.
Since I tried Ludwig back in 2017, I have been constantly using it in both editing and translation. Ever since, I suggest it to my translators at ProSciEditing.

Justyna Jupowicz-Kozak
CEO of Professional Science Editing for Scientists @ prosciediting.com